Two Weeks to Power the Future: Vestas V150 Complete!
How long does it take to build a Vestas V150 4.3MW wind turbine? Two weeks.
Two weeks have passed since the start, and now the impressive turbine, boasting a hub height of 155m and a rotor diameter of 150m, is finished.