Otada Wind Park Hits Midpoint: Two GE Cypress Turbines Installed!

We never stop halfway - the construction of the Otada Wind Park has just reached its midpoint. Two of the four GE Cypress wind turbines have been installed. We can already enjoy the majestic structures that beautify the horizon. At 151 meters hub height and rotor diameter of 158 meters, the GE Cypress turbines are among the largest in Lithuania.