Wrapping Up the Enercon E138 Hybrid Tower in Marbeck!

We are completing the construction of the Enercon E138 EP3 E2, a 4.2MW wind turbine with a hybrid tower in Marbeck, North Rhine-Westphalia. The tower consists of 29 meters of concrete and 131 meters of steel.
Thanks to our partners, @Hüffermann Krandienst GmbH.