
Blades Set for Installation on 160m Hybrid Tower in Marbeck
We are progressing with our work in Germany. Now, it's time for the blades to showcase their beauty and greatness. The blades will create a diameter of 138 meters and will be installed on the 160-meter hybrid concrete-steel tower. The construction of the Enercon E138 EP3 E2 wind turbine will soon be completed in Marbeck, North Rhine-Westphalia.
Thanks to our partners, @Hüffermann Krandienst GmbH.
Gallery